Installation of 5 MRI’s at Norfolk and Norwich University Hospital

Client: Siemens Healthineers
Value: £1.78m
Duration: 15 Weeks

Project Overview

Siemens Healthineers commissioned DD Porter to carry out enabling works for the installation of 5 state-of-the-art MRI machines at the Norfolk and Norwich University Hospital (NNUH). This high-profile project aimed to upgrade and expand the hospital’s imaging capabilities to provide enhanced diagnostic services for patients in the region. DD Porter’s role involved managing and executing the necessary preparatory works, and providing the correct environmental conditions for the MRI’s, while adhering to strict health and safety standards, and minimising disruption to hospital operations.

Objectives

  • Ensure all necessary infrastructure and facilities were in place for the seamless installation of MRI machines.
  • Complete the enabling works on time and within budget.
  • Work within a live new build construction site as part of a wider new build hospital.
  • Maintain minimal disruption to other areas of the live construction site.
  • Adhere to Siemens Healthineers’ high standards of quality and precision in a healthcare environment.

Key Challenges

1. Logistical Complexity: Coordinating the installation of such large and delicate equipment in a live construction environment posed significant logistical challenges. It required meticulous planning to ensure smooth access routes, safe transport, and careful handling of the equipment.

2. Compliance and Health & Safety: The works, within a large live new build construction site had to meet strict health and safety regulations.

3. Time-sensitive Deadlines: The project had tight deadlines due to the larger project’s operational needs. DD Porter’s ability to adhere to the schedule was critical for the main contractor and Siemens Healthineers’ overall timeline.

Project Execution

1. Site Survey and Planning: DD Porter conducted a thorough survey of the existing facilities and infrastructure to assess the site’s readiness for the MRI machines. This included reviewing power supply systems, cooling requirements, and structural load capacities to accommodate the new equipment.

2. Equipment and Logistics: DD Porter coordinated the delivery and positioning of five MRI machines, ensuring that they were carefully unloaded and manoeuvred into place with minimal disruption. Special considerations were made for the transportation of the MRI units, including the use of specialist cranes, to avoid any damage to the machines.

3. Health and Safety Measures: During the enabling works, stringent health and safety protocols were followed. This included risk assessments and the use of safety barriers, signage, and personal protective equipment (PPE).

4. Quality Control: DD Porter worked closely with Siemens Healthineers to ensure that all the required specifications were met, and all work was inspected for quality control at each stage. The team performed thorough testing of all utilities and systems that were part of the enabling works to confirm they met the necessary standards.

5. Client Communication: Regular updates were provided to Siemens Healthineers and the hospital’s management team throughout the project. A dedicated project manager ensured that all concerns were addressed promptly, and the communication flow remained clear and efficient.

Outcome

The enabling works for the installation of 5 MRI machines were completed successfully, ahead of schedule, and within budget. Siemens Healthineers was able to install the MRI units without any delays, and the hospital’s imaging department was upgraded with advanced diagnostic equipment.

  • Delighted Client: Siemens Healthineers expressed complete satisfaction with the delivery of the enabling works. The project met their high expectations in terms of quality, safety, and efficiency.
  • Seamless Installation: The MRI units were installed smoothly, with no issues arising from the preparatory works. The hospital’s team was able to start using the MRI machines without any operational delays.
  • Minimal Disruption: Thanks to DD Porter’s careful planning, main contractors construction works experienced minimal disruption, allowing the larger contructions site works to continue unhindered.
  • Enhanced Service: The completion of the project improved the hospital’s ability to offer cutting-edge imaging services to the local community, contributing to better patient outcomes and faster diagnostic times.

Client Testimonial

“Thank you to the DDP team for the work at NNUH. You’re probably all aware we handed over the last system ready for clinical use last week to a very happy customer ahead of schedule. I think everyone involved did an amazing job in getting handover of five MR systems (and first week of applications training on 2 systems) from the first delivery in less than four weeks. The quality of the rooms was very high, and this was reflected in the comments from both the users and the physics team from Cambridge. Great job, thank you!”

Siemens Healthineers – Project Manager

Conclusion

DD Porter’s successful completion of the enabling works for Siemens Healthineers at Norfolk and Norwich University Hospital is a testament to their expertise in managing complex healthcare projects. The collaboration with Siemens Healthineers and the main contractor’s delivery team was seamless, and the project was delivered ahead of schedule and to the highest standards. The result was the installation of five new MRIs fully operational and ready to enhance patient care, marking a significant milestone for both the hospital and the community it serves.